How to use this calculator
- Choose single- or three-phase and enter the load's real power (kW, or hp as real power).
- Enter the existing power factor (from a meter or bill) and the target PF. The target must be higher than the existing value.
- Enter the supply voltage (line-to-line for three-phase) and select 50 Hz or 60 Hz.
- Read the kVAr, the capacitance per phase and the current reduction.
How it works: the formula
A capacitor supplies reactive power locally, so less of it has to come through the supply. Real power does not change. Only the reactive side of the power triangle shrinks. The factor tan φ1 − tan φ2 is the “kVAr per kW” multiplier printed in many capacitor tables.
Variables and units
| Symbol | Meaning | Unit |
|---|---|---|
| P | Real power of the load | kW |
| PF1, PF2 | Existing and target power factor | — |
| Qc | Capacitor reactive power required | kVAr |
| f | Supply frequency | Hz |
| C | Capacitance per phase | µF |
Worked example
100 kW at PF 0.70, corrected to 0.95 on a 400 V, 50 Hz three-phase supply:
A delta bank needs one third of the capacitance of a star bank for the same kVAr, because each capacitor sees √3 times the voltage and Q rises with V². In practice you would choose a standard bank such as 70 or 75 kVAr, preferably in automatic steps.
Assumptions
- Load real power is constant.
- Sinusoidal supply at the stated frequency.
- Balanced bank on a balanced three-phase supply.
Limitations
- Capacitors combined with supply inductance form a resonant circuit. With harmonic-producing loads this can amplify harmonics and damage capacitors. Detuned (reactor) banks and a harmonic assessment are then needed (see IEEE 519 and the IEC 61000 series).
- Fixed capacitors sized for full load can over-correct at light load. Automatic stepped banks avoid a leading power factor.
- A capacitor's rated kVAr applies at its rated voltage and frequency. At a lower voltage it delivers less, in proportion to (V/V_rated)².
- Switching transients, inrush current and discharge requirements are not covered here.
References
Standards and texts that cover this topic. Use the edition adopted in your jurisdiction.
- IEEE Std 1036, Guide for the Application of Shunt Power Capacitors.
- IEC 60831-1, Shunt power capacitors of the self-healing type for AC systems up to 1000 V.
- IEEE Std 141 ("Red Book") — power factor and its improvement in industrial plants.
- IEEE Std 519, Standard for Harmonic Control in Electric Power Systems.
Frequently asked questions
Why not correct to exactly 1.0?
The last few hundredths of PF need disproportionately large banks, and any load drop then pushes the system leading. Tariffs usually reward 0.95 or so. That is a common target.
Should the bank be star or delta?
Low-voltage banks are usually delta-connected because they need a third of the capacitance. Medium-voltage banks are often star-connected, frequently ungrounded, for protection reasons. The kVAr required is the same either way.
Where should the capacitors go?
Central banks at the main switchboard are simplest. Capacitors at individual large motors also cut current in the feeder cables. Motor-connected capacitors must not over-excite the motor when it is switched off; maker guidance limits their size.
Will power factor correction reduce my energy bill?
It reduces reactive-power charges and maximum demand charges where kVA is billed. It also cuts I²R losses in cables a little. It does not reduce the kWh your equipment actually uses.
Related calculators
- kVA to kW Converter (and kVAr) — Convert between kVA, kW and kVAr using power factor, solve the power triangle from any two values and get the matching line current.
- Transformer Loading & Efficiency Calculator — Find transformer percentage loading, full-load currents on both windings, copper loss scaled with load squared, total losses and efficiency at the actual load.
- Three-Phase & Single-Phase Current Calculator — Calculate line current from kW, hp or kVA for three-phase (line-to-line or line-to-neutral) and single-phase supplies, with PF, efficiency and every step shown.
How these formulas were checked: methodology and testing.