How to use this calculator
- Add up daily energy: for each appliance, watts × hours per day, then sum (Wh/day).
- Enter peak sun hours for your site, tilt and worst design month. This equals the daily irradiation in kWh/m² on the panel plane.
- Keep the default derate of 0.75 unless you have a loss budget. 0.75–0.80 is typical for off-grid systems.
- Enter the panel rating, Isc and panels per string, then the battery autonomy days, DoD, bank voltage and efficiency.
How it works: the formula
A peak sun hour is one hour of irradiance at 1000 W/m², the condition under which panels are rated (STC). If your site receives 5 kWh/m² per day, a 1 kWp array produces about 5 kWh before losses. The derate factor accounts for higher cell temperature, dust, mismatch, wiring, charge control and battery round-trip losses.
Variables and units
| Symbol | Meaning | Unit |
|---|---|---|
| E_day | Daily energy demand at the load | Wh/day |
| PSH | Peak sun hours (kWh/m²/day on the array plane) | h |
| derate | Overall system performance factor | — |
| P_panel | Panel rating at STC | W |
| DoD, η | Usable depth of discharge; battery-to-load efficiency | — |
| Isc | Panel short-circuit current at STC | A |
Worked example
5000 Wh/day, 5 peak sun hours, derate 0.75, 400 W panels (Isc 10.5 A) two per string, 2 days autonomy on a 48 V bank at 50 % DoD and 90 % efficiency:
Assumptions
- Energy balance on a daily basis for the design month.
- The derate covers all system losses. Battery efficiency here applies to energy drawn during autonomy days.
- Panels are rated at STC.
Limitations
- String voltage must stay within controller and inverter limits at the coldest temperature, because Voc rises as temperature falls. This is not checked here.
- Shading, orientation and seasonal variation need a proper irradiation dataset or simulation (for example PVGIS or NREL's PVWatts).
- Battery Ah does not include ageing, temperature or the extra capacity needed to recover after cloudy spells.
- Wiring and protection follow NEC Article 690 or IEC 60364-7-712 and the equipment instructions.
References
Standards and texts that cover this topic. Use the edition adopted in your jurisdiction.
- IEC 60364-7-712, Low-voltage electrical installations — Requirements for special installations — Solar photovoltaic (PV) power supply systems.
- NFPA 70, NEC Article 690 (Solar Photovoltaic Systems), including 690.8 on the 125 % factor for PV source circuit current.
- IEEE Std 1562, Guide for Array and Battery Sizing in Stand-Alone Photovoltaic (PV) Systems.
- IEC 61215 / IEC 61730 — PV module design qualification and safety; STC defined in IEC 60904-3 reference spectrum.
Frequently asked questions
Where do I get peak sun hours?
From an irradiation database such as the European Commission's PVGIS or NREL's tools. Use monthly averages on your panel tilt. For off-grid design, take the worst month you need the system to cover.
Why 1.25 × Isc for the controller?
On bright, cold days panels can produce more current than at STC, and electrical codes treat PV current as continuous. NEC 690.8 sets maximum PV circuit current at 125 % of the summed Isc, and controllers are commonly chosen on the same basis. Always check the controller's own input limits.
Is a 0.75 derate too pessimistic?
For off-grid systems with batteries it is realistic. Temperature losses alone are often 8–15 % in warm climates, and battery round-trip losses add more. Grid-tied systems without batteries often reach 0.80–0.85.
How many days of autonomy do I need?
Two to three days is common for homes. Critical loads in cloudy climates may need five or more, often with a generator as backup. More autonomy means a larger battery and a larger array to recharge it.
Related calculators
- Battery Runtime Calculator with Peukert — Estimate battery bank runtime from Ah, voltage, depth of discharge and inverter efficiency, with an optional Peukert correction and a series/parallel bank builder.
- Cable Voltage Drop Calculator — Voltage drop for single-phase, three-phase and DC cables with temperature-corrected copper or aluminium resistance, reactance, % limit check and minimum size solver.
- Diesel Generator Fuel Consumption Calculator — Estimate diesel generator fuel use in L/h from load and specific fuel consumption with an editable part-load curve, plus daily use, tank runtime and cost.
How these formulas were checked: methodology and testing.